{"id":2700,"date":"2026-03-23T15:00:00","date_gmt":"2026-03-23T15:00:00","guid":{"rendered":"https:\/\/lamrenovation.com\/2026\/03\/23\/endow-offices-fort-saskatchewanvnvan-phong-dow-fort-saskatchewan\/"},"modified":"2026-03-23T15:00:00","modified_gmt":"2026-03-23T15:00:00","slug":"endow-offices-fort-saskatchewanvnvan-phong-dow-fort-saskatchewan","status":"publish","type":"post","link":"https:\/\/lamrenovation.com\/en\/2026\/03\/23\/endow-offices-fort-saskatchewanvnvan-phong-dow-fort-saskatchewan\/","title":{"rendered":"Dow Offices \u2013 Fort Saskatchewan"},"content":{"rendered":"<p>The Dow Diamond and Maintenance, Repair and Operations (MRO) Centre form a coordinated expansion of Dow\u2019s industrial campus in Fort Saskatchewan, Alberta. Developed in collaboration with York Construction, the two buildings anchor opposite corners of a 25\u2011acre site and were conceived to support both administrative and operational functions while aligning with Dow\u2019s long\u2011term decarbonization goals.<\/p>\n<p>The Diamond serves as the primary administrative workplace, accommodating up to 200 employees in a flexible, activity\u2011based environment that balances collaboration and focused work. The ground floor functions as a social and connective hub, featuring a light\u2011filled auditorium, fitness studio, canteen, and a central community space that encourages informal exchange. An outdoor terrace extends gathering areas during warmer months, offering additional room for dining, casual meetings, and team interactions. The upper level provides quieter work settings with open and enclosed workstations, offices, training rooms, and dedicated quiet rooms that support concentration and varied work modes.<\/p>\n<p>Complementing the Diamond, the MRO Centre accommodates materials storage, specialized operational bays, and dedicated staff areas. Barrier\u2011free connections between the two buildings allow them to function seamlessly in tandem.<\/p>\n<p>Natural light is prioritized throughout the plan, with glazing and interior sightlines organized to draw daylight deep into the floor plate and maintain a strong connection to the surrounding landscape. Lemay\u2019s interior concept uses calm, monochromatic palettes expressed through durable finishes, tilework, and acoustic panels that enhance comfort and long\u2011term performance. Strategic accents of Dow\u2019s signature red provide intuitive wayfinding and reinforce brand identity across the workplace.<\/p>\n<p>The Diamond\u2019s geometric massing\u2014composed of precast concrete and glass curtain walls\u2014interprets Dow\u2019s iconic logo, establishing a distinct architectural presence within the industrial setting. Its angular composition and strong horizontal expression draw inspiration from Alberta\u2019s expansive prairie landscape and open skies.<\/p>\n<p><strong>Design<\/strong>: Lemay<br \/> <strong>Client &#038; Design-Builder<\/strong>: York Construction Inc.<br \/> <strong>Graphics &#038; Wayfinding<\/strong>: Lemay<br \/> <strong>Sustainability<\/strong>: Lemay<br \/> <strong>Landscape Architecture<\/strong>: ISL Engineering<br \/> <strong>Mechanical and Electrical Engineering<\/strong>: Englobe Engineering<br \/> <strong>Structural Engineering<\/strong>: Protostatix + Kerkhoff Engineering<br \/> <strong>Civil Engineering<\/strong>: ISL Engineering<br \/> <strong>Photography<\/strong>: Adrien Williams<\/p>\n<p>The post Dow Offices &#8211; Fort Saskatchewan appeared first on Office Snapshots.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Dow Diamond and Maintenance, Repair and Operations (MRO) Centre form a coordinated expansion of Dow\u2019s industrial campus in Fort Saskatchewan, Alberta. Developed in collaboration with York Construction, the two buildings anchor opposite corners of a 25\u2011acre site and were [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-2700","post","type-post","status-publish","format-standard","hentry","category-news-event"],"_links":{"self":[{"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/posts\/2700","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/comments?post=2700"}],"version-history":[{"count":0,"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/posts\/2700\/revisions"}],"wp:attachment":[{"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/media?parent=2700"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/categories?post=2700"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lamrenovation.com\/en\/wp-json\/wp\/v2\/tags?post=2700"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}